Page 59 of 65 FirstFirst ... 9495758596061 ... LastLast
Results 581 to 590 of 641

Thread: My space framed nova with big power XE and sequential box

  1. #581
    Senior User
    Join Date
    Apr 2006
    Location
    Colne, lancs
    Posts
    1,817
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    Afraid this is the only update I have..........



    Just been and collected the car due to Tony moving units. Nothing has been done on it in months

    This should give me chance to get some work done on it as I'm not tied to his hours.

  2. #582
    Senior User Ben's Avatar
    Join Date
    May 2002
    Location
    New Zealand
    Posts
    9,554
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    So will you be finishing it yourself?

  3. #583
    Senior User pie's Avatar
    Join Date
    Jan 2009
    Location
    Blackwood gwent South Wales
    Posts
    6,769
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    epic build buddy

  4. #584
    Senior User
    Join Date
    Apr 2006
    Location
    Colne, lancs
    Posts
    1,817
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    Quote Originally Posted by Ben View Post
    So will you be finishing it yourself?
    No

    Im going to get the loom, oil lines, fuel lines and brake lines in the car so all the brakets are in place then take it all back out before ot goes back to him.

    Theres loads of little bits that i am capable of doing.

    When iv finished with it the car will go back down to him for finishing.

  5. #585
    User
    Join Date
    Apr 2011
    Location
    somewhere
    Posts
    251
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    fair play to u mate i would tke my hat off if i had 1 on

  6. #586
    Senior User
    Join Date
    Apr 2006
    Location
    Colne, lancs
    Posts
    1,817
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    Bit of an update

    I have now finally finished the oil lines and have them temporarily installed. Iv made a floor for inside the car out of carbon and have the fuel lines finished. Currently on with making some tabs to hold the floor in and all the lines. Also modifying the ap pedal box to a spring return and making a throttle linkage.

    Iv made a start on the loom but short on time at the minute.

    Heres a few rough photos.










  7. #587
    Club Member Club Member peester's Avatar
    Join Date
    Aug 2003
    Location
    staffordshire
    Posts
    5,963
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    some hardcore parts there.
    "let me drive.. i won't make a fool out of you"

  8. #588
    Senior User
    Join Date
    Apr 2006
    Location
    Colne, lancs
    Posts
    1,817
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    Iv been slowly collecting, need to buy a few more bits to finish the carbon extinguisher system off.

  9. #589
    Go low or Go home. Moderator Benn's Avatar
    Join Date
    Mar 2004
    Location
    Fareham, Hampshire
    Posts
    23,815
    Post Thanks / Like
    Mentioned
    12 Post(s)
    Tagged
    0 Thread(s)

    Default

    So glad you are still slowly building this.
    All I wanted was a Pepsi, just one Pepsi
    Far from suicidal
    Still I get them tendencies
    Bringing back them memories
    That I really miss when I reminisce

  10. #590
    Senior User
    Join Date
    Apr 2006
    Location
    Colne, lancs
    Posts
    1,817
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    Default

    Slowly being the key word. Ha. I will get there one day.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •