Welcome to the Performance Nova Group forum!
To make full use of the forum, you need to be registered and logged in. Registration is free and allows you to read and post on the forum, and from there you can continue to join the club if you wish.
bit more progress. wire wheeling and hammerite
Nice work fella
Not a glamorous job but needs must!
Sourced some front lowering springs so swapped them over and chucked the front shocks back on along with the rear springs and shocks. i will wire wheel and hammerite the rear arches at somepoint.
pinched some bonnet lifters off a guy at work who was scrapping his vectra aswell. i'll make them fit somehow
Forum Rules