Rest is a page back.
Tested in the vice, seems strong enough.
Bolt it on, all fit.
Mark bolt holes, Remove, cut, weld, file.
Made a bit to fill the gap.
Test fit, file a bit more, weld bit in.
Not pretty i know. But refit, all works, engine raised up about an inch and a bit.
Before,
After, might not look alot, but it is.
Now i've removed the mount, drawn it all out, so i can remove the back part (where the weldings been done) and make a new one piece side with the holes in the right place. But might give it to the metal fab guy i use as he has thicker steel and welds much better.
But the cv joint is still stuck in the box.