Need to rename the thread title to 1990 to 2017!
First update of 2017 and I thought I would do something a bit different. The light was against me and I just quickly did this on my phone but here are a couple of moving updates:
https://goo.gl/photos/stY69e5Agc7tdvaX8
https://goo.gl/photos/bt2jzwQXsZ44CvFo7
Still a lot to do, especially as I have booked it in to have the decals fitted on 31/3/17 and also want to get it MOT'd and tuned that same week. I have made a list of things left to do so I can keep track on things but a few areas are being held up by missing or damaged bits or due to having some more stuff plated:
Fit gutter trims
Make and fit n/s rear brake line
Fit handbrake cable clip (plated)
Secure blower motor (nuts plated)
Fit front wiper motor, arms and blades (mounts plated)
Fit plastic bulkhead cover and block
Fit under bonnet foam pieces
Fit starter motor
Fit alternator and belt
Fit distributor and HT leads/surpressors/lead retaining clip
Finish loom, fit battery and earth/live wiring
Fit and adjust gear selector
Fit clutch cable
Fit speedo cable
Replace front pinch bolts
Fit brake pad clips
Torque front hubs and fit split pins
Fill engine/gearbox oil, coolant and washer fluid
Rebuild and fit servo/pipe & master cylinder/reservoir
Fill and bleed brakes
Fit o/s front door plastic, cards and handles
Fit o/s rear quarter card
Fit arch trims
Insert pins in to grab handle!
Fit o/s sill trim
Finish fitting dash I switches and clocks
Fit runners, fittings and seats