Thanks rich
Next was to rebuild the original 51k 1.3 engine
The nova drove home sound no problems
But it's not part of my plan to leave parts untouched
New parts on engine fitted
Clutch kit, reverse light switch, full gearbox gasket set including drive shaft seals,
Timing belt kit and water pump, full engine gasket and seal kit,
New oil pump, got the sump powder coated, engine mountings
Clutch cable, dizzy, dizzy cap, rotar arm, HT leads,
Plugs, air and oil filters.
Polished the rocker cover and oil cap
Loads of stainless steel bolts
The head was sent away for skimming and checking
Loads more that I've probably forgot