View Full Version : ive finally done it...
it only took 2 months...the E30 has a hole in the sump lol lol :mad::mad:
so i get to go scrappy tomorrow in the rain i expect to rip off the one up there :tard:
how? maccy d's speed hump?
its not like there are many canal bridges in your neck of the woods.....
Must try harder, my mate has a 20vT converted corrado G60, and he smashed six sumps in a week, he has had it plated and reinforced, the plug removed and welded up and still smashed it again three times in one day:eek:
how? maccy d's speed hump?
its not like there are many canal bridges in your neck of the woods.....
our maccys dont have speed bumps ;) haha i think i did it on the farm, theres a bumpy tracks with the odd rock poking out.
6 sumps in a week :o i would, but £20 a time for oil + a sump which is £50 of ebay would be an expensive week for me lol
http://i1200.photobucket.com/albums/bb329/Ninja_Guin/IMAG0025.jpg
http://i1200.photobucket.com/albums/bb329/Ninja_Guin/IMAG0024.jpg
chemical metal... or get a bloke to weld it up
turbojolt
04-12-11, 09:32 AM
My brother has done this about 6 times now
6 sumps in a week is pretty bad really, i thought i was bad, i did 2 front pipes on the pug last month, how low is the bm?
Powered by vBulletin® Version 4.2.5 Copyright © 2025 vBulletin Solutions, Inc. All rights reserved.