Not loads of progress made but beam is almost finished now I have handbrake cables and the bolts and nuts for the ARB and handbrake equaliser. Just got to get the bearing races pressed in to the drums and I could wrap it up and put it one side ready for fitting. The welding should resume this weekend and I am going to rebuild the driveshafts now I have all the bits prepped (shafts nicely powder coated).
I am probably there with 95% of the stuff I needed to source and buy but no doubt a few little bits will crop up along the way. Its silly things like the caliper slide mounts as I have gone for the ATE calipers and 236mm vented discs so got a different carrier.